https://www.hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

12-30

2021

New Order for 35Mpa Cyclone Desander

As 2021 draws to a close, HC has received a new order for cyclone desander. In order to ensure the delivery after New Year's Day, the factory is stepping up the production.

12-21

2021

CNOOC produced water treatment project has been basically completed

In November, HC signed an order agreement for CNOOC produced water treatment equipment, with an agreed delivery period of 50 days. At present, the whole set of equipment has been basically completed

12-15

2021

HC continuously improves competitiveness to keep up with market development

After decades of development, the market competition pattern of domestic oil service industry is gradually clear, that is, marketization, technicalization and internationalization will be the development trend in the future.

12-10

2021

Order for two gas-liquid two-phase separators has been completed

In November, regular customer from Yan'an, Shaanxi Province signed two gas-liquid two-phase separators with us, with an agreed delivery period of 20 days.

12-03

2021

Successful development of domestic UHP gas production wellhead

On November 16th, the 140 MPa ultra-high pressure FF-NL gas production wellhead was successfully installed and tested in DINA 2-H15 well, and the pressure test was qualified

11-26

2021

ASME standard skid-mounted shell-and-tube heat exchanger of HC

After more than a month, the skid-mounted shell-and-tube heat exchanger designed by HC has been manufactured.

11-20

2021

HC oil-gas-water 3-phase separator & water bath heater have arrived at the site

Regular domestic customer ordered an oil-gas-water three-phase separator and a water bath heater(WBH) from HC. After more than a month of processing and production, they were finally delivered ahead of the agreed schedule.

11-16

2021

How to separate oil, gas and water in well test three-phase separator

When the oil in the formation reaches the wellhead and flows along the outlet pipe and gathering pipe, the oil-gas mixture is formed according to its composition

<< 1 ... 20 21 22 23 24 ... 48 >>

(©) 2019-2025 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US