https://www.hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

12-23

2020

HC Petroleum Equipment offers solutions for flare gas NGL recovery

Flare Gas NGL Recovery Unit is designed to recover valuable natural gas liquids (NGLs) from natural gas which would normally be burned by the flaring systems.

12-22

2020

HC designs and manufactures horizontal test separators for Nanya customers

HC is designing and manufacturing horizontal test separators for the Bangladesh project. This equipment is composed of separator body, regulating valve, various pressure, liquid level, temperature, metering instruments, data acquisition and control system

12-16

2020

Water Bath Heater is In Rush Production

Recently, domestic customers have ordered a batch of water bath heaters from us. This equipment is mainly used for heating crude oil or natural gas to the temperature required in the process of oil and gas gathering and transportation system

12-02

2020

Natural gas filter separator skid ordered by domestic customers will soon be completed

A batch of filter separator skids ordered by domestic customers is about to complete production, waiting to be loaded and delivered.

11-26

2020

Three-phase separator is ready for loading and delivery

The production of three-phase separator ordered by foreign customers has been completed and is ready for shipment. The equipment has passed the necessary certifications and v international standards and specifications.

11-18

2020

HC launches skid-mounted natural gas desulfurization unit

The sulfur in natural gas exists in the form of H2S, COS, CH3SH, CH3SSCH3, among which H2S and a small amount of organic sulfur are mainly present.

11-13

2020

HC supplies 2160psi test separator for customers in South Asia

Following the 1440psi three-phase separator, HC once again supplied the 2160psi three-phase test separator to south Asian customers. In addition to the high-efficiency separation function of oil/gas/water

11-05

2020

Two water bath heaters passed the acceptance inspection

Two water bath heaters ordered by domestic customers have been delivered to the site on October 31st, and the acceptance has been successfully completed.

<< 1 ... 31 32 33 34 35 ... 55 >>

(©) 2019-2025 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US