https://www.hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

10-31

2020

HC is designing and manufacturing skid-mounted vertical surge tank for domestic customers

Recently, HC received an inquiry from Xinjiang customers about the skid-mounted vertical surge tank, which requires a diameter of 1.9 m, a height of 5.4 m, a design pressure of 150 psi and a volume of 100 bbl.

10-26

2020

The three-phase separator of South Asia oil & gas field has completed production and is ready for delivery

The three-phase separator of oil and gas field supplied by HC for South Asia project has been completed and is ready for shipment. This separator has the natural gas treatment capacity of 25MMSCFD

10-21

2020

Russian choke valves are packaged and ready for shipment

After 45 days, all choke valves ordered by Russian customers have been completed and are being packaged for shipment.

10-15

2020

Two water bath heaters ordered by domestic customers

With the advent of winter, the demand for water bath heater has increased greatly. HC recently received an inquiry from a domestic user about the bath heater.

10-10

2020

HC begins to production right after the National Day holiday

With the end of the 8-day National Day holiday, HC factory also immediately put into busy production.

09-24

2020

HC has the industry's leading manufacturing equipment to ensure fast delivery

HC is a manufacturer with strong R&D and design capabilities in the petrochemical industry. In order to expand production capacity and provide customers with convenient products and services

09-22

2020

HC supplies skid-mounted 3-phase test separator for Bangladesh project

Recently, a third-party company entrusted by Bangladeshi customer visited HC to discuss the cooperation. Accompanied by our project manager and technical engineer, the customer visited the plant

09-16

2020

HC supplies 10,000psi choke manifolds to Russia

Recently, the Russian customer has ordered a batch of 10,000psi choke manifolds from us. Now the advance payment has been arrived and our factory is in urgent production.

<< 1 ... 32 33 34 35 36 ... 55 >>

(©) 2019-2025 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US