https://www.hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

12-28

2024

Successful Delivery of Horizontal Oil and Gas Separator for CNOOC Project

On December 25th, HC completed the delivery of a horizontal oil and gas separator designed and manufactured for a CNOOC project. This equipment was custom-built to meet the specific requirements of the

12-24

2024

The Role of the Flash Drum in Glycol Dehydration Units

The flash drum is an essential component in glycol dehydration units, which are widely used in natural gas processing to remove water content, preventing hydrate formation and corrosion in pipelines.

12-21

2024

How to Choose the Right Filter Separator for Your Needs

In the oil and gas industry, filter separators play a crucial role in maintaining the efficiency and longevity of production systems. These devices remove solid particles, water, and other contaminants from

12-16

2024

HC Secures Order for Pressure Vessels in Pakistan Project

Recently, HC has secured an order to supply three high-quality pressure vessels for a major oil and gas project in Pakistan. The order includes an LP Separator, a Flare Knockout Drum, and a Closed Drain Vessel

12-10

2024

HC Delivers Five Two-Phase Separators for Qinghai Project 

HC has recently completed the production of five custom-designed two-phase separators for an important project in Qinghai. This project posed unique challenges due to the region's harsh cold climate, demanding solutions that could

12-02

2024

The Application of Molecular Sieve Dehydration in LNG Production

In the production of liquefied natural gas (LNG), deep dehydration is a critical pre-treatment process. During liquefaction, natural gas is cooled to cryogenic temperatures (typically below -162°C) to convert it into a liquid state,

11-25

2024

HC Receives Repeat Order for Five Horizontal Gas-Liquid Two-Phase Separators

Recently, a long-term partner from Qinghai placed a repeat order with HC for five horizontal gas-liquid two-phase separators. This decision comes after the outstanding performance of the separators previously procured from HC

11-19

2024

The Complexity of Operating a Well Testing Choke Manifold

In the realm of well testing, where precision and safety are paramount, the Well Testing Choke Manifold emerges as a pivotal tool for managing wellbore pressure and ensuring seamless operation.

<< 1 ... 3 4 5 6 7 ... 48 >>

(©) 2019-2025 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US