-
HC is pleased to announce the successful delivery and on-site installation of a customized wastewater treatment system for natural gas purification wastewater treatment applications.
READ MORE
-
Recently, a flare knockout drum manufactured by HC has been successfully installed and commissioned at a natural gas wellsite project in Kazakhstan, providing reliable support for the safe and stable operation of the site flare system.
READ MORE
-
As a professional heat exchanger manufacturer, HC recently completed the fabrication of two shell-and-tube heat exchangers for a project in Serbia. With the main manufacturing and inspection processes finished,
READ MORE
-
The unit has successfully arrived at the client’s site in Kenya, where unloading and preliminary positioning have been completed, marking the transition into the on-site installation phase.
READ MORE
-
In the early stage of oil well production, separator selection is not just a technical decision—it directly impacts production efficiency, downstream processing costs, and even the long-term stability of the entire operation.
READ MORE
-
In a chemical industrial park, large volumes of high-strength organic wastewater are generated during production. These effluents contain a variety of refractory organic compounds that are difficult to degrade
READ MORE
-
This is our second visit to the project site in Kazakhstan. Compared with the first trip, which focused on delivery and installation support, this time our priority was much clearer — to follow up on actual operation
READ MORE
-
In oil and gas field projects, oil gas separators and oil water separators are often confused with each other, and in some cases even regarded as the same type of equipment with only different separation efficiency.
READ MORE