-
When sand and solid particles flow together with oil, gas, or water, they can cause serious problems such as erosion of valves, damage to downstream equipment, and unexpected production interruptions.
READ MORE
-
In oil and gas equipment procurement, decision-making is often dominated by “equipment price” and “delivery time.” However, in real field operations, the factors that truly determine project
READ MORE
-
Recently, HC welcomed a delegation of Russian clients to our manufacturing facility for an on-site inspection of a customized shell and tube heat exchanger.
READ MORE
-
HC recently completed the fabrication of a skid-mounted gas sweetening unit for a natural gas treatment project in Thailand. The package was designed to remove hydrogen sulfide (H₂S) from the gas stream before downstream processing
READ MORE
-
HC has recently completed the manufacturing of a 100 BBL Dual Compartment Gauge Tank with Pump for an oilfield project in Canada. The package is designed to support well testing and production monitoring operations
READ MORE
-
Recently, HC completed the manufacturing of a skid-mounted crude oil transfer pump package for an oilfield project in Nigeria. The unit has successfully passed factory inspection and is now prepared for delivery to the project site.
READ MORE
-
Therefore, separator selection for heavy oil should not simply follow conventional crude oil standards. In most cases, we recommend a combination of heating and demulsification technologies to achieve reliable separation performance.
READ MORE
-
Recently, a water bath heater manufactured by HC Petroleum Equipment successfully arrived at the customer’s project site in the United Arab Emirates.
READ MORE